Tel: Contacts    
 
  HOME | ABOUT US | SERVICES | PRODUCTS | OUR CLIENTS | CONTACTS  
 
 
 
 
Home
 
Design & Installation
 
Treatment Process
 
Environmental Policy
 
Hard Poles
 
Decking
 
 
 
 
 
 
 
The Vacuum Treatment Process
 
1. Timber Loaded into treatment vessel. Initial vacuum applied and timber cells are evacuated of air. Vacuum held.
2. Cylinder flooded under Vacuum with Tanalith E wood preservative and the addition of Tanatone brown colourant, if required.
3. Hydraulic pressure applied, forcing the preservative deep into the structure of the timber, the amount of penetration achieved is a function of species treated and treatment
 
Cylinder Treatment Process
 
 
 
specification
4. Final vacuum extracts excess preservative solutions, which is pumped back to storage.
5. Low pressure inside timber draws in surface solution when vented to atmosphere
 
2011 © Kampala Poles Treatment Plant Limited.